Skip to content
Industries · Construction & Infrastructure

Custom AI/ML solutions for construction & infrastructure industry

Custom AI and ML for general contractors, heavy civil, and specialty trades. Site safety detection, progress monitoring, RFQ quoting, and spec NLP — built for jobsite reality.

Book a Construction AI Strategy Session Free 30-minute call · mutual NDA included
Site camerasPPE, struck-by and unsafe-zone detection runs on the IP cameras and drone footage your sites already capture.
BIM-linkedProgress imagery compared against your BIM model and schedule, with deviations sent to the project team to confirm.
Self-hostedModels run on an edge box on site or in a cloud account you own, so drawings and footage stay on infrastructure you control.
Outcomes

What AI in construction changes for contractors and project teams

Six measurable outcomes across preconstruction and bidding, field safety, BIM compliance and project controls, built on your project data and run in your environment.

Site Safety Vision

Computer vision flags PPE violations, struck-by exposures and unsafe-zone breaches in real time and routes each alert to the foreman to review.

Progress vs BIM Monitoring

Compare drone, crane and fixed-camera imagery against the BIM model and schedule, with deviations flagged for the project team to confirm.

RFP & RFQ Quoting

LLMs that parse spec packages, surface ambiguous clauses, and generate first-pass quantity takeoffs.

Spec & Submittal NLP

Index full spec books, route each submittal to the right discipline and flag conflicting requirements for a project engineer to review.

Productivity & Crew Analytics

Time-on-task models that flag underperforming crews and equipment idle time without micromanaging.

Schedule Risk Forecasting

Predict slippage, liquidated-damages exposure, and critical-path drift before they show up on the weekly report.

Capabilities

Capabilities across the construction & infrastructure value chain

Preconstruction & Bidding

  • RFP / RFQ document parsing and quoting LLMs
  • Quantity takeoff with vision and BIM extraction
  • Subcontractor selection and risk scoring
  • Win-probability and margin-target modeling

Field Operations & Safety

  • PPE and unsafe-behavior detection from site cameras
  • Struck-by and crush-zone proximity monitoring
  • Hot-work, confined-space, and lift-compliance vision
  • Worker-vital and fatigue monitoring via wearables

Progress, Quality & BIM Compliance

  • Drone, crane, and fixed-camera progress capture
  • BIM-vs-built deviation detection
  • Punch-list automation from photo evidence
  • Pay-app verification and quantity reconciliation

Project Controls & Risk Management

  • Schedule-slippage prediction and critical-path drift
  • Weather and supply-chain disruption modeling
  • Change-order classification and cost forecasting
  • Insurance claim and litigation-risk scoring
From the Playbook

How site-camera safety vision works for a general contractor

At a general contractor, site safety checks often rely on weekly walks and self-reported safety logs. We build a computer-vision layer on the contractor’s existing site cameras and drone fleet that flags PPE violations, struck-by exposures and unsafe-zone breaches in real time and routes each alert to the foreman’s phone. The foreman reviews every alert and decides the response, and the same imagery feeds progress-vs-BIM views that project managers confirm before the weekly report.

See computer vision services →
Real-time
PPE violations, struck-by exposures and unsafe-zone breaches flagged as they happen on site.
Foreman-led
The foreman reviews each alert and decides the response on site.
BIM progress
Drone and camera imagery compared against the BIM model for project managers to confirm before the weekly report.
Start Today

Speak with a construction AI expert

A 30-minute scoping call. We come prepared with your project portfolio, your site and equipment counts, and a directional read on which workflows are worth automating first.

Book a Strategy Session
Ask us about
  • Computer-vision site safety and PPE monitoring
  • Progress-vs-BIM tracking with drones and fixed cameras
  • RFP / spec / submittal NLP and quantity takeoff
  • Schedule-risk and critical-path drift forecasting
  • Productivity and crew analytics from video
  • Change-order and litigation-risk scoring
Questions

Frequently Asked Questions

Yes. We integrate with Avigilon, Axis, Hikvision, OpenSpace, Reconstruct and most jobsite IP-camera systems. Drone footage ingests from DJI Pilot, Pix4D, DroneDeploy and Skydio. A private edge box on site can run inference locally, so large volumes of footage stay off the jobsite hotspot.

Yes. BIM ingest covers Autodesk Build (the former BIM 360, now part of Autodesk Construction Cloud), Revit, Navisworks, Bentley iModels, and Trimble Connect. Project management connects to Procore, Autodesk Build, and Oracle Aconex via API; PlanGrid is in maintenance mode with Build as its designated successor, so new integrations route there directly. Outputs publish back as RFIs, observations, punch-list items, or pay-app annotations in the systems your foremen and PMs already use.

We never store identifiable worker footage longer than your retention policy allows. PPE and struck-by models work on body shape and posture without facial recognition by default. Union and subcontractor data stays scoped to the GC contractually authorized to see it; we offer per-trade tenant isolation when projects require it.

Yes. The underlying ML platform (camera ingest, model registry, monitoring) is reusable across project types. Domain models differ — heavy civil focuses on earthwork progress and equipment utilization, vertical on safety and BIM compliance, specialty on submittal NLP and crew productivity — but most multi-discipline GCs run one shared stack with multiple model families.

The models work from the records your teams already produce: spec books, drawings and BIM models, schedules, daily logs, submittals and site camera or drone footage. Spec and submittal models index the spec book and route each submittal to the right discipline for a project engineer to confirm. Vision models compare site imagery against the BIM model and schedule. Schedule models mark activities likely to slip so the project manager can adjust the plan. Everything runs on an edge box on site or in a cloud account you own, so drawings, bids and site footage stay on infrastructure you control.

Ready to talk construction AI?

Start with a 30-minute strategy session. We come prepared with a directional read on your operation and a scoped proposal.

Discuss your Construction & Infrastructure projectDiscuss your project